![]() ![]() Maintenance workers simply access the lighting sources at each end from the walkways around the pool when bulbs need to be changed. #Hanovia photon v2 maintenance manual seriesThe lighting sources are located on both ends of the long tubes, while a series of mirrors and diffusers in the middle portion of the tube serve to spread the light throughout. Stalco crews cleaned and, where necessary, repaired the existing lighting fixtures, which are long tubular lights designed for installation over difficult-to-access areas. Photo by Ola Wilk/Wilk Marketing Communications Smith’s handicapped lifts to accommodate swimmers in wheelchairs, installed new water filtration and treatment systems, replaced and repaired steampipes, repaired the concrete structural support system, and upgraded the HVAC system. In addition to renovating the 220,000-gallon pool, the project team also built a new staff office, mounted all-new diving platforms, renovated a storage room, installed two new ADA-compliant S.R. Stalco completely fenced off the entire construction area, making sure students and faculty could not enter the site, and then removed two large 5’x12′ windowpanes from the pool area on the Harrison Street side to create independent access to the construction area. Security of access and construction safety were of the utmost importance during the renovation. served as mechanical contractor ARA Plumbing Corporation was the plumbing contractor and the waterproofing and tile work subcontractor was Baybrent Tile Corporation. was the mechanical, electrical and plumbing (MEP) engineer Eldor Contracting Corporation was the electrical contractor Premier Mechanical Services, Inc. In addition to Stalco, the project team included construction manager AECOM the architect and engineer of record was MP Engineers & Architects Genesys Engineering P.C. The Stalco team was careful to ensure that this independent access did not interfere with foot traffic. With this, we created independent access to the construction area,” said Stalco’s Christopher Caulfield, a superintendent on the project. The next step was to remove two large 5’x12′ windowpanes from the pool area on the Harrison Street side. ![]() “First, we completely fenced off the entire construction area, making sure students and faculty could not enter the site. Thus, security of access and construction safety were of the utmost importance. While the pool was taken out of service during construction, the team was working during the school year (as well as over holidays) in an occupied building on a busy college campus within a crowded city. “We performed extensive aesthetic and infrastructure renovations to the 10,500-square foot facility, including work on the steampipe network and the concrete structural system underneath the pool,” stated Kevin G. The 4,575-square foot pool features six competition lanes, each of which is six feet wide and 25 yards long. The aquatics center is located in the main campus complex on Harrison Street and the West Side Highway in lower Manhattan, with an entrance at 77 Harrison Street. BMCC is part of the City University of New York (CUNY) system. The Dormitory Authority of the State of New York (DASNY) served as the project manager. General contractor Stalco Construction has completed a $7.2 million renovation of the Borough of Manhattan Community College’s (BMCC’s) aquatics center, including the 220,000-gallon pool. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |